Serving Kissimmee, St. Cloud, Buenaventura Lakes, Hunters Creek, Poinciana, Celebration & nearby Osceola County communitiesCall (321) 414-9813

Garage floors, shed pads & equipment slabs

Concrete Slabs in Kissimmee, FL

Level, solid slabs set high enough to stay out of standing water after a storm.

  • Free on-site measuring visit
  • Written, itemized quote for every job
  • Permit and right-of-way checked for your address
Concrete Contractors in Kissimmee, FL

Slabs for Sheds, Garages and Equipment

Concrete slabs carry the things that are hard to move: a shed full of tools, a backup generator, an AC condenser, a filled hot tub or a car. Around Kissimmee, the biggest difference between a slab that lasts and one that tilts is what goes on before the pour. That means compacting the sand underneath and setting the top high enough that rainwater runs away from it. A shed on a pad that sits in a puddle every afternoon from June through September will rot at the base. A generator pad that sinks on one side puts stress on its connections.

Slabs we pour

  • Shed pads for storage sheds and workshops, with an optional ramp for a mower
  • Garage floors for new detached garages and workshops, or replacements in existing ones
  • AC and generator pads set level and above grade, sized for the equipment and the clearances it needs
  • Hot tub bases, thicker and reinforced for the weight of a filled tub
  • Trash can and side-yard pads to keep bins out of the mud
  • Parking pads for a boat, trailer or RV beside the driveway

Thickness and reinforcement

HomeGuide's slab guide says shed foundations are usually about 4 inches thick and do not typically need reinforcement. On bigger sheds or soft ground we often add wire mesh anyway. Two-car garage floors are typically reinforced concrete 4 to 6 inches thick, according to the same guide. HomeGuide's patio guide calls for 6 inches with extra reinforcement under hot tubs. A boat or RV pad needs the driveway-level depth of 5 to 6 inches. We match thickness to what will sit on the slab.

Around the edge of a slab that will hold walls, the concrete is thickened so the walls have something solid to stand on. For a new garage or workshop, the building plans set those details and we pour to the drawings.

Keep it above the water

A NEON soil description from Osceola County shows a seasonal high water table about 20 inches below the surface. Kissimmee's flood guide also says most local flooding comes from ponding after heavy rain. For that reason, we set most pads slightly above the surrounding ground and slope the top so water runs off. We keep the slab out of any drainage swale between lots. A shed pad is made a few inches bigger than the shed so rain off the roof lands on concrete and runs away, not into soft ground at the base of the walls.

Get a Free Estimate

Permits for new buildings

New sheds, garages and some equipment installations can need a building permit, and their location on the lot matters. The city's flood guide says all development within the City of Kissimmee requires a permit. Unincorporated areas follow Osceola County rules. Before we pour a slab for a new structure, we check what your address requires and work with whoever is supplying or framing the building. That way the slab size, edges and anchor points match what will sit on it.

Replacing a garage floor

An old garage floor that has cracked across or sunk in the middle can usually be replaced without touching the walls. We break out the old floor, compact the base, and pour a new slab sloped toward the door. Then we tie it to the existing stem wall or edge. A sealer or coating afterward makes oil and tire marks easier to clean.

When you can use it

HomeGuide's slab guide says people and pets can walk on a new slab after 1 to 2 days and vehicles can drive on it after 1 to 2 weeks. Full cure takes 28 to 48 days. A shed can usually go on within days, and we give you dates for heavier loads.

Slab Work We Quote

Pads and floors for buildings, equipment and vehicles.

Shed pads

Level pads slightly bigger than the shed, with an optional ramp.

Garage and workshop floors

New floors for new buildings, and replacements inside existing ones.

Equipment pads

Bases for AC condensers, generators and pool equipment.

Hot tub bases

Thicker, reinforced slabs for the weight of a filled tub.

Boat and RV pads

Driveway-thickness parking pads beside the house.

Concrete Pool Decks in Kissimmee, FL

Typical Slab Costs

ItemPublished range
4-inch slab, per sq ft$6 to $8
6-inch slab, per sq ft$8 to $10
10 x 10 ft slab$600 to $1,200
12 x 12 ft slab$860 to $1,700
Shed foundation (100 to 400 sq ft)$600 to $4,800
Two-car garage floor (400 to 576 sq ft)$2,400 to $6,900
Gravel base, per sq ft$1 to $3

Figures from HomeGuide's concrete slab cost guide (national averages). Kissimmee prices can run higher or lower, and tear-out, access, base work and finish all change the total. Your written estimate after we measure is the price.

Start to Finish

1. Size it to the load

We match the slab to the shed, equipment or building plans and check permits.

2. Prep

Turf or old slab removed, sand compacted, grade raised where needed.

3. Forms and steel

Forms, thickened edges and reinforcement placed.

4. Pour and cure

An early-morning pour, finishing and curing, with dates for setting loads.

Stamped Concrete in Kissimmee, FL

Why Choose Us for Concrete Slabs

Set above standing water

Pads are raised and sloped so they do not sit in afternoon puddles.

Built to the plans

Edges and anchor points matched to what will sit on the slab.

Concrete Slabs Questions

Does a shed slab need rebar?

HomeGuide says shed slabs are usually about 4 inches thick and do not typically need reinforcement. For larger sheds, soft spots or a workshop with heavy equipment, we usually add mesh.

How thick should a hot tub slab be?

HomeGuide's patio guide calls for 6 inches with extra reinforcement under hot tubs. Check the tub maker's requirements too, and we will build to whichever is stricter.

Can you replace my garage floor without tearing down the garage?

Usually, yes. We break out the old floor, rebuild the base and pour a new slab inside the building. If we find rotted framing or a damaged stem wall, we tell you before we go further.

Do I need a permit for a shed slab?

It depends on the structure and where your property is. Kissimmee's flood guide says all development in the city requires a permit, and county rules apply outside city limits. We check before scheduling.

Concrete Slabs in Kissimmee, FL

Get a Concrete Slabs Estimate

Free on-site estimates for shed pads, garage floors and equipment slabs around Kissimmee.

Call Now: (321) 414-9813